Service Type
Annual Savings
$89,145
Square Footage
250,000
Completion Date
9/4/15
Entegrity’s scope at Searcy County Schools includes performance contracting services for the district’s facilities in Marshall and Leslie, AR. In sum, this district-wide project covers nearly 250,000 square feet of conditioned space, and will generate $89,145 in annual guaranteed energy and operational savings. Conservation measures for this project include:
- Installation of over 6,500 low-wattage LED lamps across the district
- Installation of district-wide Building Automation System (BAS) software to manage HVAC temperatures, humidity, and indoor air quality
- Low-flow toilets and faucets throughout district
- Replacement of low-efficiency HVAC units with high-performance models
- Installation of personal computer power management software
- District-wide re-commissioning of over one hundred and fifty (150) HVAC units